Search
Close this search box.

Water shortage hits Kumasi following shut down of treatment plants

Facebook
Twitter
LinkedIn
WhatsApp
Pinterest
Facebook
Twitter
WhatsApp

By: Jennifer Frimpong Wiredu

Management of the Ghana Water Ltd (GWL) in the Ashanti Region has shut down the Barekese and Achiase Water Treatment plants for repairs. The shutdown is due to a major burst on the 36-inch transmission line that supplies water to a greater part of the Kumasi metropolis. 

In a statement, GWL explained that the transmission line was damaged following the construction of drains from the Suame roundabout to Breman Ahenful.  

Some affected areas include Suame, Asoka, Bantama, Barekese, Manhyia, Oforikrom, Kwadaso, Adum, KNUST, Asokore Mampong, and surrounding areas.

Ghana Water assures the affected communities that its engineers are working diligently to repair the line and resume operations as soon as possible, adding that water supply will resume immediately upon completion of work.

More Stories Here

Leave a Reply

Your email address will not be published. Required fields are marked *